Foundations for a Sustainable Future - Summary of Statistics
Director's MessageTo ReaderOrganizational ProfileOur Governance StructureHighlightsStatisticsLooking AheadVerification
Energy Choice, Consumption and Design Efficiency Unit 2003 2002 2001
Electricity consumed (APB Centre only) (1) kWh/m2 250.4 262.4
272.2
Building complexes with OTTV < 23 W/m2 (2) % of total no. of projects 100% of 14 97% of 30 93% of 15
Buildings complexes with OTTV < 18 W/m2 (2) % of total no. of projects 43% of 14 63% of 30
67% of 15
High performance building service equipment used (3) no. applied 553
431
278
Energy saved due to energy efficient (estimated) (4) kWh 108,000,000
85,000,000
84,000,000
Equivalent monetary savings HK$ 108M
85M
84M
Solar PV panels under design or construction (5) m2 8,300 7,000 1,700

Materials Choice and Consumption Unit 2003 2002 2001
Non-ozone Depleting Substances        
Refrigerants installed no. of application 34 34 19
Fire extinguishing agents used no. of application 9 6 7
Office Materials        
A4-size office paper with 100% recycled content used
reams 700 500 50
Total paper and paper products used (6) tonnes 200 290 (7) -
Types of environmentally preferable office supplies in use types 17 17 -

Emissions to Air Unit 2003 2002 2001
CO2 emissions equivalent to electricity consumption
(APB Centre only) (8)
tonnes 1,139 1,194 1,238
CO2 emissions avoided equivalent to energy saved (8) tonnes 47,500 37,500 37,000

Waste Avoidance, Arising, Treatment and Disposal Unit 2003 2002 2001
Construction Activities        
Timber saved due to use of reusable metal hoardings m3 645
1,040
476
Timber saved due to use of pre-cast/semi pre-cast slab construction, aluminum and steel table formwork m3 694 1,641 1,972
Timber saved due to use of metal formwork for in-situ construction m3 225
37 2,203
C&D wastes disposed of to landfills tonnes 107,126
42,100 -
C&D materials disposed of to public fill areas m3 474,357
642,704 -
Concrete with recycled aggregates used per $M contract value m3 / $M 3.94
- -
Hardcore with recycled aggregates used per $M contract value m3 / $M 3.12 - -
Internal Housekeeping        
Office paper recovered for recycling tonnes 5,600 5,950 7,700

Biodiviersity
Unit 2003 2002 2001
Landscaped areas to improve biodiversity
m2
35,300 94,338
-
Trees and shrubs planted for urban landscaping
Trees; shrubs no.
35,502;
942,317
16,480; 903,898
-
Annuals (flowering plants) planted for urban landscaping no. 78,470 114,426 -

Health and Safety Unit 2003 2002 2001
At ArchSD Construction Sites        
Fatalities cases 1 4 0
Non-fatal reportable accidents (9) cases 331 366 421
Fatal accident rate (per 100,000 manhours) ArchSD (HKCI) 0.0021(0.01) 0.01 (0.01) 0 (0.01)
Non-fatal accident rate (per 100,000 manhours) ArchSD (HKCI) 0.68(1.89) 0.95 (2.37) 1.20 (3.19)
At ArchSD Offices        
Fatalities cases 0 0 -

Awareness Raising and Training Unit 2003 2002 2001
Training for Staff and Contractors        
Environmental training (i.e. courses / seminars / workshops / visits) no. 50 86 92
Trainees on environmental courses no. 777 1140 1937
H&S training (i.e. courses / seminars / workshops / visits)
no. 60 63 63
Trainees on H&S courses no. 2,412 2,493 2,502
Outreach for the Public        
EHS exhibitions / talks no. 18 13 20

EHS Compliance Unit 2003 2002 2001
Environmental convictions at ArchSD sites
no. 12 46 25
H&S convictions at ArchSD sites no. 85 83 58

Target Achievement Status Unit 2003 2002 2001
No. of targets achieved (10) no. 45 33 31
No. of targets achieved better than expected (10) no. 21 29 12
No. of targets on-going (10) no. 3 6 2
No. of targets failed (10) no. 4 4
4
Overall performance (i.e. targets achieved / total no. of targets) % 90% (66 of 73) 86% (62 of 72) 88% (43 of 49)


Explanatory Notes:

- = data not collected / not available
HKCI = Hong Kong Construction Industry

(1) The total floor area of the APB Centre is approx. 10,340m2.
(2) Figures based on calculated data available from design projects approved by ArchSD at the Stage 3 Detailed Design Phase.
(3) Figures compiled based on the data of project completion for new works and the date of issue for the works order for refurbishment projects.
(4) Figures calculated based on the projected savings due to the use of energy saving building services equipment.
(5) Figures based on the number of projects under design and construction.
(6) Figures include consumption of A4-size office paper, A3-size office paper, computer paper, plotting drawing paper, plotting tracing paper, printing drawing paper and envelopes.
(7) Figure for 2002 has been revised from 177.2 to 290 tonnes to add back paper consumption of printing drawing paper.
(8) CO2 emission equivalents are calculated based on a conversion factor of 0.44kg CO2 per kWh.
(9) A non-fatal reportable accident is defined as an accident that results in incapacity for more than 3 days.
(10) Target achievement for 2002 and 2003 include environmental targets under the ISO 14001 system and quality targets under the ISO 9001 system. Whilst the targets achievement for 2001 includes environmental targets only.