| Units | 2008 | 2007 | 2006 | 2005 | 2004 | |
|---|---|---|---|---|---|---|
| Electricity consumed (QGO and APB Centre) [1] | kWh/m2 | 244 | 245 | 265.2 | 277.5 | 277.5 |
| CO2 emission equivalent to electricity consumption (QGO and APB Centre) [2] | Tonnes CO2e | 4,071 | 4,089 | 4,644 | 4,858 | 5,130 |
| Building with OTTV less than 23W/m2 | % & no. of total no. of projects | 100% & 24 of 24 | 100% & 15 of 15 | 100% & 7 of 7 | 100% & 11 of 11 | 100% & 10 of 10 |
| Building with OTTV less than 18W/m2 | % & no. of total no. of projects | 75% & 18 of 24 | 66.7% & 10 of 15 | 85.7% & 6 of 7 | 63.6% & 7 of 11 | 70% & 7 of 10 |
| Energy saved due to energy efficient installations [3] | GWh | 1.7 | 4.9 | 39 | 84 | 119 |
| Equivalent monetary savings | HK$ million | 1.7 | 4.9 | 39 | 84 | 119 |
| Avoided CO2 emissions [4] | in ,000 Tonnes CO2e | 1.19 [5] | 3.43 | 27.3 | 58.8 | 83.3 |
[1] Offices in QGO and APB Centre represent 94% of total ArchSD office space.
[2] Territory wide default GHG emission factors were used based on the Guidelines to Account for and Report on Greenhouse Gas Emissions and Removals for buildings (Commercial, Residential or Institutional Purpose) in Hong Kong issued by the Environmental Protection Department, HKSAR in July 2008. Previous data were adjusted accordingly.
[3] Energy efficient installations refer to LED Exit sign, occupancy sensor/ photo sensor, water-cooled chiller/ evaporative cooling tower etc.
[4] A revised baseline for calculating the estimated energy saved was adopted in 2007 by taking into the account of the requirements of the BEC 2007 Edition and also the technological development. Direct comparison of data before and after 2007 is therefore inappropriate.
[5] Saving would mostly be harvested from the medium or large-scaled projects. In 2008, large numbers of relatively small-scaled projects, like schools, open spaces, toilets were completed and their contributing savings were comparatively small. In particular, the saving comparison benchmark in reference to (EMSD's BEC 2007 Edition) has been raised up since 2007, the savings would be deemed lower.
| Units | 2008 | 2007 | 2006 | 2005 | 2004 | |
|---|---|---|---|---|---|---|
| Fuel consumption by ArchSD's pool cars | Litre | 14,697.4 | 18,690 | 19,639 | 24,169 | N/A |
| GHG emission equivalent to fuel consumption by ArchSD pool cars [6] | Tonnes CO2e | 39.8 | 50.6 | 53.2 | 65.4 | N/A |
[6] GHG emission factors for mobile combustion are based on the Guidelines to Account for and Report on Greenhouse Gas Emissions and Removals for buildings (Commercial, Residential or Institutional Purpose) in Hong Kong issued by the Environmental Protection Department, HKSAR in July 2008. The GHG figures for 2005, 2006 & 2007 have been restated from 57.1, 46.4 and 44.1 respectively, as given in the previous Sustainability Report.
| Units | 2008 | 2007 | 2006 | 2005 | 2004 | |
|---|---|---|---|---|---|---|
| A4 paper consumption | Reams | 19,653 | 20,263 | 21,765 | 21,182 | 23,700 |
| A3 paper consumption | Reams | 1,054 | 1,063 | 1,241 | 1,378 | 1,417 |
| Envelop consumption | Number | 59,478 | 55,323 | 70,812 | 77,119 | 65,818 |
| A4/A3 paper with recycled content consumption | Reams / % of total paper purchased | 21,460 / 99.49% | 18,515 / 91.8% | 18,984 / 79.5% | 12,622 / 64.2% | 5,753 / 21.3% |
| Types of eco-friendly office consumables | Types | 13 | 13 | 13 | 13 | 18 |
| Units | 2008 | 2007 | 2006 | 2005 | 2004 | |
|---|---|---|---|---|---|---|
| Timber saving | Volume of Timber Saved in m3 (Ratio Normalised [7] by Contract Value) | 367.05 (0.05) |
1,424.29 (0.22) |
284.69 (0.20) |
1,382 (0.56) |
1,461 (0.46) |
| Water saving | No. of Water-saving Sanitary Appliances (Ratio Normalised by Contract Value) | 4,242 (0.56) |
6,254 (0.94) |
1,473 (1.00) |
2,831 (1.15) |
3,312 (1.29) |
| Flushing water use in APB Centre | Cubic Metre | 33,789 | N/A | N/A | N/A | N/A |
[7] The normalised ratio is an indication of the extent ArchSD has improved in an area after taking into account the changes in contract value each year, so as to facilitate better comparisons over time. Such data in 2004 & 2005 are re-adjusted due to incorporation of data from all contract works, also including works for maintenance and improvement.
| Units | 2008 | 2007 | 2006 | 2005 | 2004 | |
|---|---|---|---|---|---|---|
| Construction & demolition materials | ||||||
| C&D waste disposed of to landfills | Tonnes | 26,833 | 24,952 | 46,858 | 76,536 | 96,793 |
| C&D materials disposed of to public fill areas | Tonnes | 839,097 | 564,284 | 206,209 | 585,447 | 651,057 |
| Recyclable waste collected at APB Centre | ||||||
| Waste paper | kg | 2,331 | 2,286 | 2,475 | 4,570 | 6,859 |
| Aluminium cans | No. | 277 | 231 | 220 | 254 | 546 |
| Plastic bottles | No. | 286 | 250 | 265 | 424 | 629 |
| Units | 2008 | 2007 | 2006 | 2005 | 2004 | |
|---|---|---|---|---|---|---|
| Convictions per 100,000 man-hours | ArchSD sites (HK sites) | 0.501 (1.397) |
0.424 (0.546) |
0.140 (0.518) |
0.231 (0.417) |
0.515 (0.848) |
| Units | 2008 | 2007 | 2006 | 2005 | 2004 | |
|---|---|---|---|---|---|---|
| Resources devoted to environmental works | Value ($ million) | 789.3 | 639.7 | 639.45 | 664.1 | 675.3 |
| Percentage of annual expenditure | 10.3% | 8.0% | 7.1% | 6.0% | 5.2% |
Considering all our refrigerants and fire extinguishing agents used during replacement are environmentally friendly models as well as the insignificant consumption amount, we will not report our non-ozone depleting substances consumption value in the future.
| Units | 2008 | 2007 | 2006 | 2005 | 2004 | |
|---|---|---|---|---|---|---|
| Staff establishment (As at March 31 each year) | No. | 1,766 | 1,766 | 1,813 | 1,887 | 1,981 |
| Training | ||||||
| No. of training courses (including internal and external seminars/ workshops/ training courses/ visits) | No. | 152 | 207 | 324 | 180 | 237 |
| Numbers of trainees | No. | 3,492 | 2,597 | 2,548 | 1,255 | 1,293 |
| Injury | ||||||
| Staff injury cases | No. | 0 | 2 | 5 | 7 | 1 |
| Staff sick leave granted for staff injury cases | Days | 0 | 163 | 110 | 207.5 | 91 |
| By Post | ||
|---|---|---|
| Directorate | % | 2.25 |
| Professional | % | 22.80 |
| General Staff | % | 21.40 |
| Site Staff | % | 31.36 |
| Technical | % | 22.18 |
| By Age | ||
| Age under 30 | % | 1.5 |
| Age 30-49 | % | 63.7 |
| Age 50 or above | % | 34.8 |
| By Ethnicity | ||
| Chinese | % | 99.7 |
| Non-Chinese | % | 0.3 |
| By Gender | ||
| Male | % | 73.4 |
| Female | % | 26.6 |
| Male | Female | |
|---|---|---|
| Age 30-50 | 2 (0.1%) | 5 (0.3%) |
| Age 51-55 | 6 (0.4%) | 3 (0.2%) |
| Age 56-60 | 21 (1.2%) | 2 (0.1%) |
| Units | 2008 | 2007 | 2006 | 2005 | 2004 | |
|---|---|---|---|---|---|---|
| No. of fatalities | ArchSD | 1 [8] | 0 | 2 | 3 | 1 |
| Fatal accident rate per 100,000 man-hours | ArchSD (HK Construction Industry) | 0.001 (0.011) |
0 (0.010) |
0.0085 (0.008) |
0.0099 (0.012) |
0.0024 (0.0072) |
| No. of non-fatal accidents | ArchSD | 91 | 93 | 126 | 185 | 279 |
| Non-fatal accident rate per 100,000 man-hours | ArchSD (HK Construction Industry) | 0.48 (1.71) |
0.44 (1.69) |
0.54 (1.79) |
0.61 (1.67) |
0.67 (1.68) |
[8] One fatal construction site accident in 2008 in Contract No. SS R309 that a worker fell from ground level to the bottom of a drainage trench of about 2.5m deep. An independent site audit check was immediately conducted on the spot to ensure the site's safety management system was in order.
| Units | 2008 | 2007 | 2006 | 2005 | 2004 | |
|---|---|---|---|---|---|---|
| Total number of voluntary work hours carried out by our staff | Hours | 2,129 | 2,526 | 2,005 | 1,194 | 1,360 |
| Number of active Voluntary Service Team members [9] | No. | 26 out of 1,766 | 35 out of 1,766 | 35 out of 1,699 | 47 out of 1,813 | 41 out of 1,887 |
| Number of staff received commendation for voluntary service [10] | No. | 13 | 20 | 12 | 14 | 1 |
| Number of Volunteers | No. | 48 | 45 | 44 | 42 | 38 |
| Number of Voluntary Projects Completed | No. | 53 | 50 | 49 | 37 | 30 |
[9] Active Voluntary Service Team member is defined as team member contributes more than 20 hours on voluntary service.
[10] Staff who can receive commendation for voluntary service is defined as team member contributes more than 30 hours on voluntary service.
| Units | 2008-2009 | 2007-2008 | 2006-2007 | 2005-2006 | 2004-2005 | |
|---|---|---|---|---|---|---|
| Personal salaries and allowances | HK$ million | 886.88 | 835.62 | 805.58 | 823.81 | 872.64 |
| Personnel related expenses | HK$ million | 1.71 | 0.68 | 0.70 | 0.75 | 0.81 |
| Departmental expenses | HK$ million | 100.79 | 94.01 | 65.15 | 66.69 | 68.69 |
| Other charges | HK$ million | 480.76 | 469.02 | 475.33 | 475.63 | 480.02 |