Data Summary
Data Summary

Performance Data

Environmental Performance

Resources Usage - Energy

  Units 2008 2007 2006 2005 2004
Electricity consumed (QGO and APB Centre) [1] kWh/m2 244 245 265.2 277.5 277.5
CO2 emission equivalent to electricity consumption (QGO and APB Centre) [2] Tonnes CO2e 4,071 4,089 4,644 4,858 5,130
 
Building with OTTV less than 23W/m2 % & no. of total no. of projects 100% & 24 of 24 100% & 15 of 15 100% & 7 of 7 100% & 11 of 11 100% & 10 of 10
Building with OTTV less than 18W/m2 % & no. of total no. of projects 75% & 18 of 24 66.7% & 10 of 15 85.7% & 6 of 7 63.6% & 7 of 11 70% & 7 of 10
 
Energy saved due to energy efficient installations [3] GWh 1.7 4.9 39 84 119
Equivalent monetary savings HK$ million 1.7 4.9 39 84 119
Avoided CO2 emissions [4] in ,000 Tonnes CO2e 1.19 [5] 3.43 27.3 58.8 83.3

[1] Offices in QGO and APB Centre represent 94% of total ArchSD office space.

[2] Territory wide default GHG emission factors were used based on the Guidelines to Account for and Report on Greenhouse Gas Emissions and Removals for buildings (Commercial, Residential or Institutional Purpose) in Hong Kong issued by the Environmental Protection Department, HKSAR in July 2008. Previous data were adjusted accordingly.

[3] Energy efficient installations refer to LED Exit sign, occupancy sensor/ photo sensor, water-cooled chiller/ evaporative cooling tower etc.

[4] A revised baseline for calculating the estimated energy saved was adopted in 2007 by taking into the account of the requirements of the BEC 2007 Edition and also the technological development. Direct comparison of data before and after 2007 is therefore inappropriate.

[5] Saving would mostly be harvested from the medium or large-scaled projects. In 2008, large numbers of relatively small-scaled projects, like schools, open spaces, toilets were completed and their contributing savings were comparatively small. In particular, the saving comparison benchmark in reference to (EMSD's BEC 2007 Edition) has been raised up since 2007, the savings would be deemed lower.

Resource Usage - Fuel

  Units 2008 2007 2006 2005 2004
Fuel consumption by ArchSD's pool cars Litre 14,697.4 18,690 19,639 24,169 N/A
GHG emission equivalent to fuel consumption by ArchSD pool cars [6] Tonnes CO2e 39.8 50.6 53.2 65.4 N/A

[6] GHG emission factors for mobile combustion are based on the Guidelines to Account for and Report on Greenhouse Gas Emissions and Removals for buildings (Commercial, Residential or Institutional Purpose) in Hong Kong issued by the Environmental Protection Department, HKSAR in July 2008. The GHG figures for 2005, 2006 & 2007 have been restated from 57.1, 46.4 and 44.1 respectively, as given in the previous Sustainability Report.

Resource Usage - Office Materials

  Units 2008 2007 2006 2005 2004
A4 paper consumption Reams 19,653 20,263 21,765 21,182 23,700
A3 paper consumption Reams 1,054 1,063 1,241 1,378 1,417
Envelop consumption Number 59,478 55,323 70,812 77,119 65,818
A4/A3 paper with recycled content consumption Reams / % of total paper purchased 21,460 / 99.49% 18,515 / 91.8% 18,984 / 79.5% 12,622 / 64.2% 5,753 / 21.3%
Types of eco-friendly office consumables Types 13 13 13 13 18

Resource Usage - Timber & Water Use

  Units 2008 2007 2006 2005 2004
Timber saving Volume of Timber Saved in m3 (Ratio Normalised [7] by Contract Value) 367.05
(0.05)
1,424.29
(0.22)
284.69
(0.20)
1,382
(0.56)
1,461
(0.46)
Water saving No. of Water-saving Sanitary Appliances (Ratio Normalised by Contract Value) 4,242
(0.56)
6,254
(0.94)
1,473
(1.00)
2,831
(1.15)
3,312
(1.29)
Flushing water use in APB Centre Cubic Metre 33,789 N/A N/A N/A N/A

[7] The normalised ratio is an indication of the extent ArchSD has improved in an area after taking into account the changes in contract value each year, so as to facilitate better comparisons over time. Such data in 2004 & 2005 are re-adjusted due to incorporation of data from all contract works, also including works for maintenance and improvement.

Waste Management

  Units 2008 2007 2006 2005 2004
Construction & demolition materials
C&D waste disposed of to landfills Tonnes 26,833 24,952 46,858 76,536 96,793
C&D materials disposed of to public fill areas Tonnes 839,097 564,284 206,209 585,447 651,057
Recyclable waste collected at APB Centre
Waste paper kg 2,331 2,286 2,475 4,570 6,859
Aluminium cans No. 277 231 220 254 546
Plastic bottles No. 286 250 265 424 629

Environmental Convictions of Contractors

  Units 2008 2007 2006 2005 2004
Convictions per 100,000 man-hours ArchSD sites (HK sites) 0.501
(1.397)
0.424
(0.546)
0.140
(0.518)
0.231
(0.417)
0.515
(0.848)

Environmental Expenditure

  Units 2008 2007 2006 2005 2004
Resources devoted to environmental works Value ($ million) 789.3 639.7 639.45 664.1 675.3
Percentage of annual expenditure   10.3% 8.0% 7.1% 6.0% 5.2%

Considering all our refrigerants and fire extinguishing agents used during replacement are environmentally friendly models as well as the insignificant consumption amount, we will not report our non-ozone depleting substances consumption value in the future.

Social Performance

Staff

  Units 2008 2007 2006 2005 2004
Staff establishment (As at March 31 each year) No. 1,766 1,766 1,813 1,887 1,981
Training
No. of training courses (including internal and external seminars/ workshops/ training courses/ visits) No. 152 207 324 180 237
Numbers of trainees No. 3,492 2,597 2,548 1,255 1,293
Injury
Staff injury cases No. 0 2 5 7 1
Staff sick leave granted for staff injury cases Days 0 163 110 207.5 91

Staff Establishment Breakdown

By Post
Directorate % 2.25
Professional % 22.80
General Staff % 21.40
Site Staff % 31.36
Technical % 22.18
By Age
Age under 30 % 1.5
Age 30-49 % 63.7
Age 50 or above % 34.8
By Ethnicity
Chinese % 99.7
Non-Chinese % 0.3
By Gender
Male % 73.4
Female % 26.6

Staff Turnover

  Male Female
Age 30-50 2 (0.1%) 5 (0.3%)
Age 51-55 6 (0.4%) 3 (0.2%)
Age 56-60 21 (1.2%) 2 (0.1%)

Contractor's Accident Rate

  Units 2008 2007 2006 2005 2004
No. of fatalities ArchSD 1 [8] 0 2 3 1
Fatal accident rate per 100,000 man-hours ArchSD (HK Construction Industry) 0.001
(0.011)
0
(0.010)
0.0085
(0.008)
0.0099
(0.012)
0.0024
(0.0072)
No. of non-fatal accidents ArchSD 91 93 126 185 279
Non-fatal accident rate per 100,000 man-hours ArchSD (HK Construction Industry) 0.48
(1.71)
0.44
(1.69)
0.54
(1.79)
0.61
(1.67)
0.67
(1.68)

[8] One fatal construction site accident in 2008 in Contract No. SS R309 that a worker fell from ground level to the bottom of a drainage trench of about 2.5m deep. An independent site audit check was immediately conducted on the spot to ensure the site's safety management system was in order.

Community Work

  Units 2008 2007 2006 2005 2004
Total number of voluntary work hours carried out by our staff Hours 2,129 2,526 2,005 1,194 1,360
Number of active Voluntary Service Team members [9] No. 26 out of 1,766 35 out of 1,766 35 out of 1,699 47 out of 1,813 41 out of 1,887
Number of staff received commendation for voluntary service [10] No. 13 20 12 14 1
Number of Volunteers No. 48 45 44 42 38
Number of Voluntary Projects Completed No. 53 50 49 37 30

[9] Active Voluntary Service Team member is defined as team member contributes more than 20 hours on voluntary service.

[10] Staff who can receive commendation for voluntary service is defined as team member contributes more than 30 hours on voluntary service.

Economic Performance

  Units 2008-2009 2007-2008 2006-2007 2005-2006 2004-2005
Personal salaries and allowances HK$ million 886.88 835.62 805.58 823.81 872.64
Personnel related expenses HK$ million 1.71 0.68 0.70 0.75 0.81
Departmental expenses HK$ million 100.79 94.01 65.15 66.69 68.69
Other charges HK$ million 480.76 469.02 475.33 475.63 480.02
Top