Data Summary

Environmental Performance

Units 2014 2013 2012 2011 2010
Electricity consumed (QGO and APB Centre) [1] kWh/m2 219 218 234 234 236
CO2 emission equivalent to electricity consumption (QGO and APB Centre) [2] Tonnes CO2-e 3,817 3,808 3,967 3,967 4,001
Energy saved due to energy efficient installations [3] GWh 0.79 6.90 9.58 [4] 17.26 [4] 16.66 [4]
Equivalent monetary savings HK$ million 0.95 [5] 6.90 9.58 17.26 16.66
Avoided CO2 emissions [3] in ,000 Tonnes CO2-e 0.55 4.83 6.71 12.08 11.66
[1] Offices in QGO and APB Centre represent a majority of total ArchSD office space. Total ArchSD office area is assumed to be 24,955.2 m2 (10,844.4 m2 for APB and 14,110.8 m2 for QGO 31/F& 33/F-41/F). The percentage of electricity consumption of the whole premises for ArchSD office at APB & QGO is assumed to be 100% and 20% respectively.
[2] Territory wide default GHG emission factors (0.7) were used based on the Guidelines to Account for and Report on Greenhouse Gas Emissions and Removals for buildings (Commercial, Residential or Institutional Purpose) in Hong Kong issued by the Environmental Protection Department, HKSAR in February 2010.
[3] The data obtained from 2007 onwards take Building Energy Code (BEC) 2007 as the baseline. Energy efficient features refer to air-conditioning installations, lighting installations, hot water installations, lift & escalator installations, building energy management system and renewable energy technologies. ArchSD staff advises which project will be completed for the concerned year and then the energy template to be completed by the corresponding project officer. Total energy saved due to energy efficient installations can be summed up.
[4] In 2010, 2 large-scale completed projects including a Government Departmental Headquarters and a Hospital Extension Block contributed to the major increase. In 2011, the Tamer Development Project was completed and contributed to most of the energy saving. In 2012, the New CAD Headquarters and North Lantau Hospital Phase 1 contributed to most of the energy saving.
[5] From 2014, the electricity tariff is assumed to be HK$1.2 per kWh whereas it was assumed to be HK$1.0 per kWh on or before 2013.
  Units 2014 2013 2012 2011 2010
Fuel consumption by ArchSD's pool cars Litre 12,800 13,142 13,998 13,263 17,723
GHG emission equivalent to fuel consumption by ArchSD pool cars [6] Tonnes CO2-e 34.7 35.6 37.9 35.9 48.0
[6] GHG emission factors for mobile combustion are based on the Guidelines to Account for and Report on Greenhouse Gas Emissions and Removals for buildings (Commercial, Residential or Institutional Purpose) in Hong Kong issued by the Environmental Protection Department, HKSAR in February 2010.
  Units 2014 2013 2012 2011 2010
A4 paper consumption Reams 18,485 18,346 18,330 19,240 20,021
A3 paper consumption Reams 1,118 1,053 934 953 1,068
Envelop consumption Reams 44,084 43,294 53,818 54,541 58,470
  Units 2014 2013 2012 2011 2010
Construction & demolition materials
C&D waste disposed of to landfills Tonnes 37,593 24,125 46,261 66,541 69,716
C&D materials disposed of to public fill areas Tonnes 604,238 644,728 556,560 681,987 894,710
Recyclable waste collected at APB Centre
Waste paper kg 19,522 19,335 19,375 23,450 26,630
Aluminium No. 4,918 5,900 8,407 11,000 13,440
Plastic bottles No. 2,975 3,385 3,690 4,748 6,805
Units 2014 2013 2012 2011 2010
Convictions per 100,000 man-hours ArchSD sites
(HK sites)
0.35
(0.275)
0.15
(0.618)
0.336
(0.606)
0.159
(0.499)
0.164
(0.437)
Monetary value of significant fines HK$ 227,000 18,500 61,000 51,000 39,000
Units 2014 2013 2012 2011 2010
Resources devoted to environmental works HK$ million 761.6 892.16 1,101.09 1,117.78 951.76
Percentage of annual expenditure % 10.9% 12.12 11.7% 9.1% 7.9%

Social Performance

Units 2014 2013 2012 2011 2010
Staff establishment (As at fiscal year-end) No. 1,810 1,795 1,792 1,781 1,780
By Post
Directorate % 2
Professional % 24
General Staff % 21
Site Staff % 31
Technical % 22
By Employment Type
Full-time % 100
By Employment Contract
Permanent (male) % 66
Permanent (female) % 28
Contract (male) % 3
Contract (female) % 3
By Age (31.3.2015)
Age under 30 % 5.2
Age 30-49 % 46.8
Age 50 or above % 48.0
By Ethnicity
Local % 100
Non-local % 0
By Gender
Male % 70
Female % 30
Units 2014 2013 2012 2011 2010
No. of training courses (including internal and external seminars/ workshops/ training courses/ visits) No. 287 270 240 205 160
Numbers of trainees No. 6,619 6,674 4,902 4,784 3,836
Type of Staff Total Training Hours Received (hours) Training Hours Per Staff (hours)
Directorate Staff 1,430 40
Professional Grade Staff 17,064 39
Technical, Site Supervisory and General Grade Staff 15,684 12
[7] As there is no distinct requirement regarding receiving training in terms of gender, we do not report the data broken down by gender.
Type of Staff Number of Staff Participated Anti-corruption Training Percentage of Staff Participated Anti-corruption Training
Directorate Staff 0 0%
Professional Grade Staff 41 9%
Technical, Site Supervisory and General Grade Staff 106 8%
  Male Female
Age under 30 0.3%(5) 0.2%(3)
Age 30-50 2.0%(36) 0.1%(1)
Age 51-55 0.4%(7) 0.2%(4)
Age 56-60 2.3%(40) 0.6%(10)
  Male Female
Age under 30 1.0%(17) 0.4%(7)
Age 30-50 2.4%(42) 1.3%(22)
Age 51-55 0.1%(2) 0%(0)
Age 56-60 0%(0) 0%(0)
  Units 2014 2013 2012 2011 2010
Staff injury cases [8] No. 4 1 4 7 4
Staff sick leave granted for staff injury cases Days 174 [9] 7 119.5 109 78
[8] The definition of staff injury cases is the reported cases of occupational injuries, under Employee's Compensation Ordinance, resulting in death or incapacity for work over 3 days.
[9] Sick leave was granted to an officer from 14.11.2014 pm to 23.4.2015 pm
  Units 2014 2013 2012 2011 2010
No. of fatalities [10] (ArchSD) No. 1
(Male:1,
Female:0)
0 4
(Male:4,
Female:0)
2
(Male:2,
Female:0)
0
Fatal accident rate [10] (ArchSD) per 100,000 man-hours 0.004 0 0.013 0.005 0
Fatal accident rate [11] (HK Construction Industry) per 100,000 man-hours 0.007 0.008 0.009 0.010 0.005
No. of non-fatal accidents [10] (ArchSD) No. 80 68 130 195 122
Non-fatal accident rate [10] (ArchSD) per 100,000 man-hours 0.31 0.27 0.43 0.51 0.35
Non-fatal accident rate [11] (HK Construction Industry) per 100,000 man-hours 1.17 1.14 1.23 1.38 1.45

[G4-22]

[10] Data of this year and the previous years were extracted from PWP Construction Accident Statistics System of DEVB as at 5 August 2015.
[11] The accident rate of the HK Construction Industry is based on the published statistics of the Labour Department and using a conversion of 1.67 accidents per 100,000 man-hours equivalent to 60 accidents per 1,000 workers per year.

 

Home | Message From The Director | Recognition and Awards | Management Approach |
Resources Utilisation and Conservation | Clients and Business Partners | Human Resources |
Objectives and Targets |

[Traditional Chinese Version] [Simplified Chinese Version] [Graphical Version] [About this Report] [About Us]
[Data Summary] [Report Verification] [GRI Content Index] [Glossary] [Feedback] [Sitemap]

(c) Copyright 2015 Best viewed by MS IE 8.0 or above with resolution 1280 x 1024.