FEHD Skylight Market
Description
In 2018 Policy Address, the Chief Executive announced that the Government planned to spare space at the section of Tin Fuk Road outside Tin Shui Wai (TSW) MTR Station for building a new public market. During the interim period, there is a need to provide a temporary market (i.e. FEHD Skylight Market) as a transitional arrangement to meet the local demand for additional choices of fresh food provisions. The temporary market is situated inside the Tin Sau Road Park, which is one of the important open spaces in the district of Tin Shui Wai. Market stalls of 36 nos. and an ancillary services block with loading/ unloading bay were commissioned on 27 December 2020.
To expedite the construction for early enjoyment of the public, Modular Integrated Construction (MiC) method is adopted in this project. There are 18 large and 18 small market stalls using different combination of containers. Each large market stall is composed of individual container while three small market stalls are sub-divided by one 30-feet container.
With the approach of an open and vibrant design fitting in the surrounding environment, an open design in the provision of main weather shelters naturally ventilated is developed and all the market stalls are air-conditioned. Modules of the shelters are manufactured off-site and transported to site for assembly using Design for Manufacturing Assembly (DfMA) method. By adopting both MiC and DfMA method in this project, the construction period can be shortened and demand of site labours can be minimised.
To expedite the construction for early enjoyment of the public, Modular Integrated Construction (MiC) method is adopted in this project. There are 18 large and 18 small market stalls using different combination of containers. Each large market stall is composed of individual container while three small market stalls are sub-divided by one 30-feet container.
With the approach of an open and vibrant design fitting in the surrounding environment, an open design in the provision of main weather shelters naturally ventilated is developed and all the market stalls are air-conditioned. Modules of the shelters are manufactured off-site and transported to site for assembly using Design for Manufacturing Assembly (DfMA) method. By adopting both MiC and DfMA method in this project, the construction period can be shortened and demand of site labours can be minimised.
Awards
ArchSD Annual Award 2020/21
Grand Award
Special Award - Sustainability
Special Award – Social Integration
Special Award - Sustainability
Special Award – Social Integration
Hong Kong Institute of Project Management (HKIPM) Project Management Achievement Awards 2020
Construction/ Engineering Category
(High Commendation)
(High Commendation)
Hong Kong Institute of Urban Design (HKIUD) – Urban Design Award 2021
Urban Intervention – Grand Award
IDA Design Award 2021
Honorable Mention
Project Data
Location
Tin Sau Road Park, Tin Sau Road, Tin Shui Wai
Type
Food, Health and Environmental Hygiene
Completion Year
2020
Client
Food and Environmental Health Department, HKSAR Government
Site Area
3,900 m2
GFA
1,000 m2
Project manager
Project Manager :
Architectural Services Department, HKSAR Government
Architect :
Architectural Branch of ArchSD/ Llewelyn-Davies Hong Kong Limited
Building Services Engineer :
Building Services Branch of ArchSD/ J. Roger Preston Limited
Electrical & Mechanical Services Engineer :
Building Services Branch of ArchSD/ J. Roger Preston Limited
Quantity Surveyor :
Quantity Surveying Branch of ArchSD/ Sun Fook Kong Construction Limited
Structural Engineer :
Structural Engineering Branch of ArchSD/ Jacobs China Limited
Main Contractor :
Sun Fook Kong Construction Limited